The excavator rock drilling attachment is designed for drilling and preparing hard rock surfaces before splitting or breaking operations. It connects directly to excavators and turns standard machines into drilling equipment for quarry, mining, and construction rock work.

Parameters of Excavator Rock Drilling Attachment
| Model | YG-130 | YG-152 | YG-210 |
| Suitable Excavator | 20T-36T Excavator | 36T-48T Excavator | 48T-65T Excavator |
| Maximum Horizontal Splitting Height | 9475mm | 9985mm | 10680mm |
| Maximum Vertical Splitting Height | 6715mm | 6905mm | 6770mm |
| Maximum Splitting Depth | 6705mm | 7025mm | 8050mm |
| Maximum Splitting Distance | 10225mm | 10875mm | 11640mm |
| Pilling Beam Length | 3875mm | 4850mm | 5525mm |
| Drilling Advance Stroke | 2000mm | 2600mm | 3500mm |
| Maximum Drilling Thrust Force | 50KN | 50KN | 50KN |
| Maximum Drilling Pull Force | 32KN | 32KN | 32KN |
| Piling Advance Stroke | 1500mm | 1800mm | 2300mm |
| Maximum Piling Thrust Force | 160KN | 160KN | 160KN |
| Maximum Piling Full Force | 100KN | 100KN | 100KN |
| Hydraulic Pressure | Max. 35Mpa | Max. 35Mpa | Max. 35Mpa |
| Hydraulic Flow | Min. 240L/min | Min. 240L/min | Min. 240L/min |
| Weight | 4200kg | 6200kg | 8300kg |
| Dimensions | 4210*1400*1785mm | 5270*1485*1840mm | 5810*1485*1840mm |
| Operation Mode | Remote Control | Remote Control | Remote Control |

Structure Details of Excavator Rock Drilling Attachment
The design focuses on durability under high-load drilling conditions.
Main components:
- Reinforced rotary head housing
- High-torque hydraulic motor
- Wear-resistant drill rods
- Stabilized boom connection frame
- Anti-vibration support system
Application of Excavator Rock Drilling Attachment
Mining excavation zones — Prepares deep rock layers for breaking in continuous mining work.
Tunnel pre-drilling work — Forms boreholes on tunnel faces to guide controlled fracture.
Road foundation rock removal — Drills roadbed rock for easier and safer excavation.
Hydropower station rock cutting — Enables controlled drilling in hard dam foundation rock.
Municipal underground structure projects — Supports low-vibration drilling in urban underground works.
Four Strict Prohibitions for Safe Operation
1. Drilling geometry control
Keep drilling strictly vertical to the rock surface.
Hole depth must exceed 600mm.
Maintain hole spacing at 500–800mm.
Uneven layout will cause unstable fracture lines and drilling deviation.
2. Lubrication must never be ignored
Never drill without oil mist lubrication or air compressor support.
Dry drilling leads to rapid bit wear and overheating.
Apply grease between wedge blocks every 3–5 cycles to reduce friction failure.
3. Start-up sequence discipline
Rotation must start together with feed motion.
Never push thrust before rotation begins.
Dry hammering is strictly prohibited.
Incorrect sequence can damage the impact system immediately.
4. Surface cleaning before drilling
Do not drill directly on dirty or loose rock surfaces.
Remove mud, gravel, and unstable fragments first.
Clean contact surface prevents bit deflection and breakage.

Cost Efficiency and Investment Return
Cost advantages:
- Lower drilling labor demand
- Reduced tool replacement frequency
- Faster cycle time per hole
- Less downtime in the rock preparation stage
Return evaluation in real projects:
- Project cycle shortened by 15–25%
- Average drilling time reduced by 30–45%
- Tool wear cost reduced by 20–35%
Customer Project Feedback
A quarry contractor in Spain submitted an inquiry after facing slow drilling progress in granite extraction zones. They searched for an excavator rock drilling attachment to replace manual drilling rigs.
Inquiry stage:
The client requested a system compatible with a 30-ton excavator and high-frequency rock drilling cycles.
Purchase decision:
After technical confirmation, they selected a hydraulic configuration paired with a rock splitter for an excavator for post-drilling fracture work.
Delivery process:
Equipment shipped within the scheduled timeline and installed on-site within 5 days.
Usage feedback (first 60 days):
- Average hole drilling time reduced from 6 minutes to 3.8 minutes
- Daily drilling capacity increased by about 40%
- Drill bit replacement interval extended by 25%
- Operator training time completed within 2 days

FAQ – Excavator Rock Drilling Attachment
Q1: Can it work with all excavator brands?
Yes, it connects with most hydraulic excavators between 10–45 tons.
Q2: What rock types can it handle?
Granite, basalt, limestone, and mixed hard rock layers.
Q3: Can it be used alone without splitting tools?
Yes, but best efficiency comes when paired with a rock splitting attachment for excavator.
Q4: How often should drill bits be replaced?
It depends on rock hardness, usually after 120–200 drilling cycles.
Q5: Is operator training required?
Basic hydraulic control training is enough, typically 1–2 days.
About YG Machinery
YG has more than 20 years of experience in heavy construction machinery manufacturing. The company holds CE certification and serves clients in over 200 countries.
We provide:
- Pre-sale technical consultation based on project conditions
- Customized configurations for different excavators
- On-site and remote operation support
- Long-term spare parts and service assistance
Our product line includes rock splitting machines, mobile crushing stations, and water well drilling rigs.









