Robotic Dredging System Cuts Mexico Pond Sludge by 70%
A municipal wastewater contractor in Jalisco was losing discharge compliance every rainy season. Its primary clarifier and two polishing ponds had sludge layers reaching 1.8 meters. Manual crews could not enter. An excavator on the bank reached only the edges. The facility needed a machine that could work underwater, continuously, without draining the ponds. That
Robotic Dredging System Cuts Mexico Pond Sludge by 70% Read More »
